Product Search
Categories
- Special offer until 31.10.2024 (5)
- News (103)
- Special offer (93)
- Musical Instruments
- T O O L S (461)
- Action Parts
- Hammerheads
- Keyboard Parts
- Wire & Strings
- Tuning Pins
- Metal Parts
- Wood Parts
- Felt, Leather & Paper
- Screws & Pins
- Benches
- Lamps & Candle Holder
- Castor Cup
- Castors & Transport
- surface treatment
- Lubricant / glue
- Covers
- Accessoires
- STEINWAY (103)
- YAMAHA (37)
- Firebasket (11)
- Catalogues + Brochures (5)
Information
Customers who bought this product also bought
Product 6 / 36
FRANKLIN TITEBOND 1 QuartFor
FRANKLIN TITEBOND 1 Quart For strong bonds in wood, laminates, particleboard, leather, horn, bone, mother-of-pearl, cloth and most other porous materials. For interior use. It provides strong initial tack and short setting time. The resulting bond is usually stronger than the wood itself, resistant to most solvents, unaffected by varnishes and easy to sand. Excess glue can be cleaned up with water. Toxin- and solvent-free. Assembly time after glue application approx. 5 minutes. The dried film is yellowish and translucent.
Titebond Original bonds stronger than wood
Titebond Original can be reopened with heat and water
Most common use on interieur projects and musical instruments
Information:
Solvent-resistant
Excellent sandability
Unaffected by finishes
Easy cleanup with water
Optimal application temperature: 20-23 °C
General application temperature: 10-30 °C
Open assembly time: 4-6 minutes
Total assembly time: 10-15 minutes
Clamping time: 30-60 Minuten
Drying process completely finished in: 24 hours
Titebond Original bonds stronger than wood
Titebond Original can be reopened with heat and water
Most common use on interieur projects and musical instruments
Information:
Solvent-resistant
Excellent sandability
Unaffected by finishes
Easy cleanup with water
Optimal application temperature: 20-23 °C
General application temperature: 10-30 °C
Open assembly time: 4-6 minutes
Total assembly time: 10-15 minutes
Clamping time: 30-60 Minuten
Drying process completely finished in: 24 hours